Damuth Trane > Solutions > K-12 Education > First Flight High School

Damuth Trane Success Story: First Flight High School

First Flight High SchoolFirst Flight High School is one of 10 schools in Dare County, NC.  This area of North Carolina is unique because most of the schools are within a half mile of the ocean and the sound. First Flight High School was opened in August 2004 and has approximately 900 enrolled students.  The system installed by Damuth Trane is an EarthWiseTM system, which saves the school system money on energy costs while maintaining Indoor Air Quality by monitoring and controlling humidity and CO2 levels.

Project Team

  • Design by – MBAJ Architecture
  • Consulting Engineer – Hickman Ambrose
  • General Contractor – Barnhill Contracting Corporation
  • Mechanical Contractor – ZBZ & Associates
  • Two 300 ton Trane CenTraVacTM CVHE chillers
  • Systecon Variable primary chilled, hot and condenser water pumping systems
  • Tracer SummitTM integrated control system
  • Modular climate changer and VAV
Watch Damuth!

How have we managed to stay on the leading edge for 40+ years? It's a really cool story.